NauticNews
  • Cavendish White joins OCEAN Independence

    04/2008 – Today, the OCEAN Independence Managing Partners Peter Hürzeler and Nicholas Dean announced the successful acquisition by OCEAN Independence of long-standing industry associate, Cavendish White. The friendly amalgamation of Cavendish White and OCEAN Independence results in the formation of one of the industry’s largest brokerage companies, managing an impressive Central Agency list of yachts […]

    Continue Reading ...
  • LEOPARD 23M OPEN

    Year build: 2005 L.O.A: 23.00 m (75.46’) Max beam:5.35 m (17.55’) Centre High: 3.14 m (10.30’) Power Engines: 2 Man 12V model “D 2842 LE 406” Engines Hours: 314 h (right) & 323 h (left) Generator: 2 Kholer 16 kw Generator Hours: 758 h (right) & 1028 h (left) Tax status : Paid (leasing) Yacht […]

    Continue Reading ...
  • Drettmann opens base in the South of France

    03/2008 – By opening of a sales base on the Côte d’Azur, the Drettmann Group continues to expand its sales network. With a total of 14 bases around the world, customer proximity and exclusive service are key components of the German yacht manufacturer’s market strategy. The new location in the marina of Port Camille Rayon […]

    Continue Reading ...
  • Antibes Yacht Show 2008

    03/2008 – Over 200 yachts in water! The second year’s show (April 17th – 20th, 2008)  is doubling in size with over 200 yachts on display – Several yachts above 50 meters will attend and the in water spaces are getting filled quickly. This year, even more of the world’s largest yacht brokerage companies will […]

    Continue Reading ...
  • Boat Asia 2008 at Marina at Keppel Bay

    Boat Asia 2008 will be held at the newly opened Marina at Keppel Bay from 24 to 27 April 2008. As the region’s leading boat and luxury waterfront lifestyle event, Boat Asia 2008 has become the top-draw, annual event for new owners of luxury boats as well as the thousands of boating enthusiasts from around […]

    Continue Reading ...
  • 85’ AKHIR CANTIERI DI PISA

    Shipyard : CANTIERI DI PISA Type : Motor Yacht Decks : 1 Deck + Fly Length :26 metres Beam : 6.15 metres Engines : 2 x Diesel Engines MTU 1800HP Model 12V2000M93 Construction : 2007 Registration : 2008 Flag : English, M.C.A short range COMMERCIAL VESSEL Note : Cantieri di Pisa know-how wood work, Zero […]

    Continue Reading ...
  • A new Briand 86 in 2009

    03/2008 – Philippe Briand has designed a new 86’ This aluminium sailing yacht is currently under construction at the Chantier C.N.B. in Bordeaux. She is to be launched in May 2009. This 86’ yacht is designed for offshore sailing. Her owner is an experienced yachtsman and has already owned a C.N.B. built yacht, which explains […]

    Continue Reading ...
  • Fairline Targa 38: European Boat of the Year 2007

    03/2008 – Construction Winner of the European Boat of the Year award for the second year in a row, British manufacturer Fairline’s reputation is well-established, with every new launch meeting with unstinting praise. In 2006 the award went to the Targa 47, and this year to the new 38-foot express cruiser unveiled at the last […]

    Continue Reading ...