NauticNews
  • Oceanco’s Y705 85.50m on her way to completion!

    08/2008 – The latest hull to arrive at Oceanco’s finishing facility in Alblasserdam is the 85.47m (280.53ft) Y705, which was transported on Friday 18 July from Oceanco’s nearby hull building facility, Zwijnenburg BV. The impressive 85.47m, 800 ton hull assembly made the short trip down the river to Oceanco whereafter her stunning Bjorn Johansson designed […]

    Continue Reading ...
  • Wally Power 70

    02/2007 – Futuristic design Construction WallyPower is a relatively recent Italian-Monegasque manufacturer producing unique models with an unprecedented silhouette reminiscent of an airplane. The boats are designed by Luca Bassani, an outstanding architect who brilliantly combines luxury and non-conformism. Above deck From the outside, the WallyPower 70 has remarkable lines that have been designed to […]

    Continue Reading ...
  • Heesen Project Altea hits the water!

    Altea, a 50-metre all-aluminium, sports a Fast Displacement Hull Form and comes in at just under the 500GT threshold. Frank Laupman of Omega Architects penned her contemporary exterior profile, with its long waterline, floor-to-ceiling windows and a purposeful profile, characterised by a gently reversed stem and chunky spray rails.

    Continue Reading ...